An 18,000-square-foot Santa Ynez estate — main residence and outbuildings — was running on a control system installed decades ago: undocumented, failing, and long past its serviceable life. Firebird specializes in exactly this job: taking over a large, inherited system, rebuilding its entire infrastructure, and executing on a hard calendar while the property stays occupied and functional. This is what that looks like.

18,000square feet
16Crestron touch panels
22WiFi 7 access points
6network switches
24audio zones
2,000′buried fiber

The same wall. Drag the line.

Firebird AV plant room rebuild — after the Santa Ynez estate system takeover Cluttered legacy AV racks and wiring before Firebird's Santa Ynez estate takeover
◂▸
BeforeAfter

One wall, one takeover: the inherited open racks and a generation of undocumented wiring — and the same view after Firebird's rebuild.

A note on the photography: every image on this page was taken by our own crew, on this job, while the work was happening. We don't use staged or stock photos — some shots are unpolished, because real work is. What you see here is actual work, performed by us.

The situation: inherited, undocumented, and failing

The estate ran on a legacy control installation, decades old. Touch panels had faded to unreadable, zones dropped offline, and every failure was permanent, because the original programming files were nowhere to be found. WiFi that predated the streaming era limped across a property built of stone and plaster — and the wiring behind it all was a generation of undocumented additions, none of it labeled.

Inherited legacy AV equipment rack — Santa Ynez estate before the takeover
The inherited rack — decades of accumulated gear.
Legacy undocumented wiring
Years of undocumented additions, none of it labeled.
Failing legacy touch panel and thermostat
Original panels and thermostats — failing, and irreplaceable.
This is the takeover problem in its purest form: a property full of dying electronics held hostage by programming nobody can access — and a client who can't live through a year-long renovation to fix it. Large takeovers on tight timelines are a Firebird specialty, and they're won with planning, not improvisation.

The plan: total infrastructure revamp, staged so the property never went dark

The scope was a complete re-work of the estate's technology infrastructure: new wiring throughout, a new enterprise network, a new control platform, and new interfaces in every room — sequenced so each system stayed live until its replacement was proven. Backbone first, then distribution, then the cutover, room by room. That sequencing is the whole trick of a critical timeline: demolition without a plan is how estates end up offline for weeks.

Worth stating plainly: nothing on this page is new-construction wiring. An 18,000-square-foot home built decades ago offers nothing ideal — closed walls, scarce conduit, and pathways improvised by generations of installers before us. This is what it looks like when Firebird takes non-ideal infrastructure and brings it to the modern world: we work with the building we're given, re-pull what must be re-pulled, save what deserves saving, and leave behind order. If your home is a retrofit, this is your preview.

The backbone: an estate-grade network, rebuilt from the wire up

Every modern system rides on the network, so it came first: an enterprise gateway, six network switches, and twenty-two WiFi 7 access points — interior units engineered from the floor plan, weather-rated units covering the grounds — with complete new structured wiring behind all of it. It lands in a new 42U Strong AV cabinet with dual rack-mount UPS units and managed power, so a grid blink never takes the estate offline.

Firebird AV crew building the new 42U equipment rack during the estate takeover
Setting the new 42U rack — every run re-pulled, landed, and labeled as it enters.
Rack with dual UPS units
Installing dual UPS units and managed power at the base of the rack.
Installing one of 22 WiFi 7 access points during the estate network upgrade
Mounting one of twenty-two WiFi 7 access points — every location engineered from the floor plan, not guesswork.
Dressed and labeled rack wiring
Dressing the switch field — labeled, documented, serviceable by anyone competent decades from now.

Across the property: two thousand feet of buried fiber

The outbuildings had been living on wireless repeaters — the estate equivalent of an extension cord. Firebird trenched armored, direct-burial single-mode fiber across the property: a six-strand run with 10-gigabit optics on both ends, giving the remote buildings the same enterprise network as the main house. Direct-burial Cat 6 rides the same trench for cameras and access points along the way.

Firebird crew pulling direct-burial fiber and Cat 6 across the Santa Ynez estate grounds
Pulling armored fiber and direct-burial Cat 6 across the grounds — the permanent way: buried, armored, done once.

The heart transplant: Crestron Home, 24 zones, 16 panels

With the backbone proven, the legacy processor stack came out. In its place: Crestron's residential 4-Series platform driving twenty-four zones of audio through streaming amplifiers — amplification, routing, and native streaming in one generation of hardware instead of the racks of separates it replaced. The crew demolished the old stack, rebuilt the rack, and re-landed every zone on the new amplifiers — every speaker wire on the property re-terminated, re-documented, and given a labeled home.

Speaker wire terminations
Re-terminating twenty-four zones of speaker wire onto new distribution.
Finished distribution enclosure
Closing up a finished distribution enclosure — the loom swept and secured.
Audio distribution panel
Landing the streaming amplifiers — the estate's audio spine behind one clean panel.
Firebird technician dressing a wall panel
Our crew dressing the distribution panels…
Technician terminating a wall enclosure
…termination by termination, each conductor labeled.

Sixteen new Crestron Home touch screens replaced the faded originals, with layouts configured room by room and the whole estate mirrored in the Crestron Home app. Climate joined the system — the thermostats that once lived beside dying panels are now scenes on glass. Lighting control runs on its own dedicated processor, keeping the lighting programming isolated, stable, and serviceable on its own schedule.

New Crestron Home touch panel
Commissioning one of sixteen new Crestron Home panels across the property.
New touch panel installed
Old glass out, new glass in — room by room, the faded panels gave way to screens that answer instantly.

What went in: the equipment manifest

No mystery boxes — this is the hardware the estate now runs on.

Network backbone
Ubiquiti UniFi Dream Machine Pro — enterprise gateway & network controller
Network switches — UniFi Pro Max 2.5G PoE++ switching plus Enterprise fiber aggregation
22×WiFi 7 access points — interior wall-mount and weather-rated exterior units (Ubiquiti U7 series)
Property fiber & expansion
2,000′Cleerline armored direct-burial single-mode fiber, six-strand
1 pr10-gigabit SFP+ optics — both ends of the fiber run
10,000′Cat 6 — complete structured re-wire across the property, including direct-burial runs along the fiber trench
Control & audio
Crestron CP4-R — Crestron Home 4-Series control processor
Crestron DM-NAX-8ZSA — 8-zone streaming amplifiers; 24 zones of amplification, routing, and native streaming
Crestron PRO3 — dedicated lighting-integration processor
Interfaces
16×Crestron Home touch screens — 7″ and 10″ (TSW-770R / TSW-1070R), plus the Crestron Home app across the estate
Power & infrastructure
Strong Signature Series AV cabinet — 42U, 25″ deep (SR-AV-CAB-42U-25IN)
UniFi 2U rack-mount UPS (1.44 kVA each) with SmartPower PDU Pro
Complete structured re-wire: new terminations, patching, keystones, and labeling throughout the property
Aftercare
Firebird+ remote monitoring & support — first year included

Field notes: the work, as it happened

Straight off the crew's phones — protection down, runs chased, racks landed, panels dressed.

Floor and duct protection down before demo starts — it's an occupied home, not a job site.
Floor and duct protection down before demo starts — it's an occupied home, not a job site.
Chasing runs through the attic — the paths the new wiring rides.
Chasing runs through the attic — the paths the new wiring rides.
The crew landing gear in the new rack.
The crew landing gear in the new rack.
Switching, UPS, and amplification staged into the build.
Switching, UPS, and amplification staged into the build.
A distribution enclosure mid-dress — loom being swept into final position.
A distribution enclosure mid-dress — loom being swept into final position.
Termination work: one conductor at a time, each one labeled.
Termination work: one conductor at a time, each one labeled.
The rack's cable spine taking shape.
The rack's cable spine taking shape.
Patch field dressed and combed before the door goes on.
Patch field dressed and combed before the door goes on.
Behind the rack: service loops and strain relief nobody will ever see — and everyone will benefit from.
Behind the rack: service loops and strain relief nobody will ever see — and everyone will benefit from.
Fresh patching, labeled both ends.
Fresh patching, labeled both ends.
Two sets of eyes on the cutover plan.
Two sets of eyes on the cutover plan.
The finished wall, up close.
The finished wall, up close.

The result: delivered, documented, on schedule

The finished plant room says everything about the approach: a glass-door rack, conduit swept in clean arcs, distribution enclosures mounted plumb and labeled — infrastructure that looks engineered because it was. Twenty-four zones of music, whole-property WiFi 7 on six switches, sixteen panels that respond instantly — cut over on schedule, with the property functional throughout.

Finished plant room after the Firebird AV system takeover — rack, distribution, and power as one wall
After: the new plant room — rack, distribution, and power, engineered as one wall.
Firebird distribution enclosures
Distribution enclosures, dressed and badged.
Rack interior detail
Inside the rack: every patch dressed, every device labeled.
Firebird crew at the finished rack
The crew that built it.
Firebird AV equipment rack glowing at night after the Santa Ynez estate rebuild
Lights out, system on.

The estate is on Firebird+ remote monitoring — we see problems before the client does, and the first year is included. And unlike the system it replaced, this one leaves with its owner holding the keys: passwords, programming, and documentation, delivered.

Inheriting a large system nobody documented? This is what we do. Firebird takes over estates and commercial plants other companies walk away from — and delivers them on the calendar, not "when it's done." We're headquartered in Santa Barbara and travel up to a hundred miles for the right project — from the Santa Ynez Valley to Ojai, Malibu, and the Pacific Palisades. Read about our takeover service →
Lutron-lit living space by Firebird AV in Santa Barbara

Begin

Living with a system nobody can service? Let's talk takeover.

Visit the private showroom by appointment, or tell us about your project and we'll be in touch within one business day.

Call Book a Consultation